Company: ConocoPhillips Project: Jasmine Well Test Location: North Sea Overview: ConocoPhillips approached Peak recognising they lacked the specialist area of expertise required for their work on the Jasmine Platform. Methodology: PEAK provided an independent chairman...
Company: EnQuest Project: Offshore SIL Verification Methodology Overview: EnQuest required the development of a SIL verification procedure and Excel analytical tool, which enabled SIL classification of instrumented systems to be verified and demonstrated to the UK...
Company: EnQuest Project: Fire and Gas Upgrade Location: Thistle Alpha Platform, North Sea, UKCS Overview: In 2013, PEAK was approached by EnQuest in order to develop a fire, gas, and smoke philosophy shut down hierarchy for the Thistle platform – post LLX. This...
Company: EnQuest Project: Thistle Alpha Late Life Extension Location: North Sea, UKCS Overview: PEAK has been involved from the beginning in the conceptualisation and implementation of a process simplification and late life extension project on a first generation...
Company: ZADCO Project: Zirku Island ESD Upgrade Conceptual Study Location: Abu Dhabi Overview: In 2013 PEAK was approached to get involved in a conceptual study for ZADCO, which aimed to detail the required Emergency Shutdown (ESD) upgrades to an oil/gas separation...