PEAK Corporate Brochure
PEAK Corporate Brochure. Please click here.
Key Steps to Asset Life Extension – Case: the Facilities Upgrade
For the majority of older facilities the current production and processing environment has changed significantly since its early days. Typically current produced water flow rate is now similar to the original oil production rate. Coupled with increasing operational and maintenance overheads and obsolete control technology, this often threatens to bring lifting costs above production revenues. read more…
PEAK Performance – Producing the Limits
Producing the Limits (PtL) is a methodology for identification of where additional production can be gained in the short term, typically focussing on a period of one to two years, although this can be applied to medium and long term gains depending on the level of capital investment allocated by the operator. read more…
Jasmine Well Test
Company: ConocoPhillips
Project: Jasmine Well Test
Location: North Sea
Overview:
ConocoPhillips approached Peak recognising they lacked the specialist area of expertise required for their work on the Jasmine Platform. read more…
Offshore SIL Verification Methodology
Company: EnQuest
Project: Offshore SIL Verification Methodology
Overview:
EnQuest required the development of a SIL verification procedure and Excel analytical tool, which enabled SIL classification of instrumented systems to be verified and demonstrated to the UK Health and Safety Executive. read more…
Fire and Gas Upgrade
Company: EnQuest
Project: Fire and Gas Upgrade
Location: Thistle Alpha Platform, North Sea, UKCS
Overview:
In 2013, PEAK was approached by EnQuest in order to develop a fire, gas, and smoke philosophy shut down hierarchy for the Thistle platform – post LLX. This was to cover the whole platform, including process, utilities, mothballed modules, drilling and accommodation. read more…
Thistle Alpha Late Life Extension
Company: EnQuest
Project: Thistle Alpha Late Life Extension
Location: North Sea, UKCS
Overview:
PEAK has been involved from the beginning in the conceptualisation and implementation of a process simplification and late life extension project on a first generation platform in the North Sea, which commenced production in the mid 1970s. read more…
Zirku Island ESD Upgrade Conceptual Study
Company: ZADCO
Project: Zirku Island ESD Upgrade Conceptual Study
Location: Abu Dhabi
Overview:
In 2013 PEAK was approached to get involved in a conceptual study for ZADCO, which aimed to detail the required Emergency Shutdown (ESD) upgrades to an oil/gas separation and stabilisation plant. This work was required in order to meet the latest industry standards. read more…